• NEWS
    • NATION
    • CORDILLERA
  • BUSINESS
  • GREEN
  • OPINION
    • EDITORIAL
  • FEATURE
  • FACT CHECK
  • HEALTH
  • LIFESTYLE
  • LITERATURE
  • SPORTS
  • ADVERTORIALS
  • ABOUT US
    • CONTACT US
Baguio Chronicle
  • NEWS
    • NATION
    • CORDILLERA
  • BUSINESS
  • GREEN
  • OPINION
    • EDITORIAL
  • FEATURE
  • FACT CHECK
  • HEALTH
  • LIFESTYLE
  • LITERATURE
  • SPORTS
  • ADVERTORIALS
  • ABOUT US
    • CONTACT US
No Result
View All Result
  • NEWS
    • NATION
    • CORDILLERA
  • BUSINESS
  • GREEN
  • OPINION
    • EDITORIAL
  • FEATURE
  • FACT CHECK
  • HEALTH
  • LIFESTYLE
  • LITERATURE
  • SPORTS
  • ADVERTORIALS
  • ABOUT US
    • CONTACT US
No Result
View All Result
Baguio Chronicle
No Result
View All Result
Home News

Council calls for inspection of P118m Kennon parking area site

Angel Castillo by Angel Castillo
June 30, 2023
in News
Reading Time: 2 mins read
5
SHARES
18
VIEWS

CITING concerns over previous city complaints of poor workmanship in infrastructure projects, the Baguio City Council has called for a joint inspection of the site for a proposed P118m parking site near the Lion’s Head in Kennon Road.

The site inspection will be done collaboratively by the Department of Public Works and Highways-Cordillera Administrative Office (DPWH-CAR), Baguio City District Engineering Officer (BCDEO)-DPWH, City Engineering Office (CEO), and Mines and Geosciences Bureau (MGB) of the Department of Environment and Natural Resources (DENR).

The parking facility being constructed near the Lion’s Head can accommodate around 400 parking slots. The said facility will cater to tourists coming up to the city in order to ease the traffic congestion experienced along the highway especially during the peak season.

ADVERTISEMENT

According to the council, the call for inspection was prompted by safety concerns raised by a Baguio-based engineer, as well as a track record of infrastructure in Baguio City being substandard.

According to DPWH-CAR, the parking facility will be turned over to the city government once completed.

The project includes the construction of gabions and Mechanically Stabilized Earth (MSE), drainage structure, flume structure, box culvert, double crib wall, additional one-lane PCCP, and a bio-engineering system consisting of coconet, cocolog, and vegetation. These structures are meant to ensure a safe and reliable national road system.

Engineers from the DPWH-CAR assured the city council that a design analysis and hydraulic analysis were conducted. They claimed these analyses proved that the structures are safe.

However, some council members pointed out that the DPWH-CAR had not yet obtained a clearance from the MGB-DENR. Councilors Leandro Yangot and Mylen Yaranon said a geohazard certification from the MGB-DENR is needed in order to ensure the suitability and safety of the project site.

 

ADVERTISEMENT
Previous Post

Council to develop guidelines for ambulant vendors

Next Post

HSDC still mum on Maharlika early turnover request

Angel Castillo

Angel Castillo

Angel graduated with a bachelor's degree in Journalism from the University of the Philippines Baguio. As somehow still the youngest on the team, he writes on mental health and well being, and the millennial’s point of view.

Related Posts

Culture and color shine at the 18th Lang-ay Festival

Culture and color shine at the 18th Lang-ay Festival

April 13, 2025
Marcos vetoes Baguio charter revision

Marcos vetoes Baguio charter revision

April 13, 2025

Yangot wants mandatory bidets in Baguio toilets

79% of 2024 Cordi tourism in Baguio

Behind the plastic curtain is the poison we can’t (un)see

Molintas barred from Cordi activists’ terrorist designation case

Latest Stories

EDITORIAL – Our litmus test

EDITORIAL – Our litmus test

May 10, 2025
Culture and color shine at the 18th Lang-ay Festival

Culture and color shine at the 18th Lang-ay Festival

April 13, 2025
VERHUNGERN – 9 above 20

How lovely

April 13, 2025

Baguio Chronicle

 

The Baguio Chronicle is the fastest- growing news publication in Northern Luzon today. It was established on December 6, 2009 in Baguio City.

© 2022 The Baguio Chronicle Website Design and Development by Neitiviti Studios.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • NEWS
    • NATION
    • CORDILLERA
  • BUSINESS
  • GREEN
  • OPINION
    • EDITORIAL
  • FEATURE
  • FACT CHECK
  • HEALTH
  • LIFESTYLE
  • LITERATURE
  • SPORTS
  • ADVERTORIALS
  • ABOUT US
    • CONTACT US